#IdigLoomis -Rundown of upcoming work on Taylor Rd.
Week ending 6/19
Taylor Road from Horseshoe Bar to King Road (Taylor’s side of road)Demolish existing sidewalk & pavement Earthwork for new sidewalkTaylor Road at Loomis Grammar SchoolDemolition and earthwork for new pedestrian crossing rampTaylor Road from Del Oro High School to the Town Limit (Del Oro HS side of road)Earthwork for new sidewalk on Taylor Rd. south of Lemos Ranch Dr.Lanes will remain open in both directions
Week of 6/22-6/26
Taylor Road from Horseshoe Bar to King Road (Taylor’s side of road)Earthwork for new sidewalk and curb & gutterTaylor Road at Loomis Grammar SchoolPour concrete for new pedestrian crossing ramp.Taylor Road from Del Oro High School to the Town Limit (Del Oro HS side of road)Pour concrete for sidewalk and curb & gutter on Taylor Rd. south of Lemos Ranch Dr.Lanes will remain open in both directions
